Main Living Room Slider Screen — Damaged Screen to Repaired Slider Presentation
The main living room slider/screen area was documented before and after correction, showing the damaged screen condition and the clean repaired finish.

A professional owner-facing media report documenting the rent-ready turnover work completed at 5436 Zeil Pl, San Diego, CA 92105 prior to tenant move-in. This report is designed to show the condition, process, and completed presentation clearly — separate from tenant placement or leasing setup.




Organized documentation showing the repair areas, prep process, before/after comparisons, and completed final condition.
Purpose: This report documents the rent-ready turnover repairs and preparation completed before the property was handed over for occupancy. It is not the tenant placement package and does not include leasing, underwriting, or tenant onboarding work. A separate invoice can be attached or sent separately.
Marked holes, paint patches, outlet areas, stairwell walls, and high surfaces documented through completion.
Sink hardware, basin repair process, drain components, under-sink areas, and final fixture condition.
Oven, stovetop, cabinet interiors, drawers, and storage areas cleaned and photographed.
Balcony floor, railing line, slider tracks, door frame details, and final patio access presentation.
Presentation Note: Decorative items visible in final photos were used only to improve final visual presentation and are not being represented here as separate repair items.
Documentation Note: Some sections include both close-up repair evidence and final wide-angle showcase images so the owner can see the actual work and the completed result.
Side-by-side visuals selected from matching or closely related areas to clearly show the value of the turnover repairs and preparation.
The main living room slider/screen area was documented before and after correction, showing the damaged screen condition and the clean repaired finish.

Wall imperfections were identified, repaired, and presented in clean final condition.


The kitchen trash pull-out cabinet area was cleaned and prepared, showing the interior cabinet condition before and after turnover service.


Paint protection, wall touch-ups, and final floor/wall presentation completed.


Marked wall imperfections and window area prep were documented through final clean condition.


High ledges and stairwell surfaces were cleaned and refreshed for move-in presentation.

Hallway wall repairs, touch-ups, and cleanup completed through the upper walkway.


Drain hardware and sink basin area documented before and after restoration work.


Sink masking, touch-up process, drain finish, and final clean basin documented.


Under-sink area was documented before and after cleanup/repair preparation.


Appliance condition documented before and after turnover cleaning/preparation.


Cooktop surface documented before cleaning and after final presentation.


Cabinet interiors were cleaned and prepared for new occupancy.


Sliding door tracks and frame areas documented for cleaning and final condition.


The balcony surface section has been corrected so the previous after image is now shown as the before, and the refreshed balcony image is shown as the completed after condition.


Window ledge/blind areas were documented and presented clean for move-in condition.


Grouped documentation from initial condition, work progress, detailed close-ups, and final condition.
Marked wall imperfections, outlet/plate areas, hallway surfaces, bedroom walls, and tall living-room surfaces were documented through prep, repair, and final clean presentation.























Kitchen scope included sink basin/drain work, hardware documentation, cabinet interiors, under-sink areas, appliance cleaning, and final kitchen presentation.


































Window/slider tracks, blind areas, balcony door frames, and access areas were captured from detail inspection through clean final condition.










































The balcony area was documented including the tile/deck surface, railing line, exterior light, sliding access, and final outdoor presentation.
















Upper stairwell, ledges, handrails, hallway walls, and transition areas were cleaned, touched up, and documented for final condition.






























Door hardware, sink components, pull-out racks, wall plate areas, and fixture details were tracked as part of the turnover repair documentation.














Completed condition photos showing the home ready for move-in after turnover repairs and preparation were completed.























































Full photo log processed into this report. Use filters to review by documentation stage or area.